Most snow guard manufacturers can answer any questions you may have about the number of snow guards you need to have a proper install for your roof.
Snow guards roof how installed.
Snow jax snow stops snow guards snow brackets snow blocks or snowguards and typically are installed on commercial metal roof buildings.
Continue to make marks 6 inches up.
To prevent extensive damage to property and people they are most commonly installed above entryways walkways and gathering spots.
Do not exceed 8 feet vertically between rows of guards.
Place a mark with a pencil 6 inches up from the lower edge of the roof and 6 inches in from one side.
And depending on the system snow guards can be placed in a single line or in multiple rows.
A couple things to keep in mind here are the steeper the pitch the more snow guards you will need and the smaller the snow stops the more of them will be required.
Make a second row of marks 12 inches from the lower edge of the roof.
Our premium snow guard products designed in several styles for various metal roof types are stocked and ready for next day shipment.
Polycarbonate snow guards can also be referred to as.
Generally speaking if installing one row and using a continuous rail type system your snow retention would be installed approximately 1 to 2 feet from the eave explains tom grant branch manager at dynamic fastener.
Snow guards should always be placed at the lower half of the roof plane.
Snow guards for metal roofs if you re located in a winter climate our snow ice guards will forbid the dangerous migration of snow and ice from falling off of your sloped metal roof and injuring people or property down below.
Snow guard spacing distances side to side in staggered rows for roofs sloped 0 flat to 2 inches in 12 of rise 2 12 slope snow guards are placed in one staggered set across the.
How to install snow guards.
Fasten snow guards through the metal roofing into a roof beam.
Starting at 6 inches from the bottom edge place 2 snow guards equally spaced apart in the valley in a staggered pattern across the entire roof area.
Snow guard placement will vary from region to region and will be influenced by roof pitch the lengths of roof runs and roof features.
Make the first mark 12.
Go up the roof 8 feet and repeat the staggered pattern of guards in every valley as placed below.
In areas that receive more than 3 feet of snow each winter place snow guards only over doorway entrances.
Pedestrian areas are the number one place to consider snow guards on a.
For roofs sloped more than 2 12 and up to 6 12 install two rows or sets of staggered guards two feet on center for.