Continue this process around the entire shower pan.
Slope of a shower floor lip.
How to fix a shower pan pre slope mistake.
36 should be considered the minimum depth for any curbless shower.
The larger the shower the easier it is to gradually slope the shower floor to the drain and contain water.
If the wall is 3 feet from the drain the cement should rise by 3 4 inches as it goes from the drain to the wall starting at the half inch depth around the drain for a total height of 1 1 4 inches at the wall.
The curb or lip around the bottom of the shower should to be slanted inward at a 5 degree approx.
The stuff you stick the tile to.
A level curb would cause the water to stand while a curb angled away from the drain would cause water to leak onto the bathroom floor.
Once you ve screeded the slope use a wood float to pack the mud down.
It assumes my posts often assume quite a bit they are condescending little bastards that you already have the curb substrate built your preslope in and the liner installed.
This post describes the top or overlay of the curb for your traditionally waterproofed shower floor with a liner.
It will take some time and patience the first time you do it but the reward is that you ll have a perfectly sloped shower pan.
Using thinset to create a 2nd pre slope on the shower pan in order to give it enough pitch so the water will flow.
3 16 to 1 4 pitch or slope so water flows in toward the drain.
This will literally lay the groundwork for a beautiful new shower tile floor.